2 TOWER

Premium apartments that are conveniently situated in scenic locations which also give you easy access to all the local amenities you need.

2&3 BHK

Spacious, comfortable and practical designs that tend to the comfort, wishes and needs of your family. Make living blissfully easy and wonderful.

18 FLOORS

Each of the two towers has 18 floors, giving you a total of 126 flats you can choose from. Select the view that is just right for you.

Live in our villa-like apartments and enjoy privacy like no other. Our homes are designed to ensure that there are no common walls, with good cross ventilation in thoughtfully crafted spaces.

Our architects give utmost priority to uniquefy your lifestyle. They will ensure you get maximum carpet area.

60% of the open space has been smartly planned out so that you get to live in a highly beautiful, amazingly spacious, relaxing and private home.

Our extra features include:

  • World class amenities

  • Property Management services

  • High-end specifications

Approved by:

TOWER 2

typical floor plan

type d

3 bhk

area: 1334sq.ft

type e

2 bhk

area: 1129sq.ft

type f

3 bhk

area: 1331sq.ft

type g

3 bhk

area: 1364sq.ft

site plan

TOWER 1

Not Opened for Sale

typical floor plan

Not Opened for Sale

type a

3 bhk

area: 1329sq.ft

Not Opened for Sale

type b

2 bhk

area: 1147sq.ft

Not Opened for Sale

type c

3 bhk

area: 1356sq.ft

typical floor plan A, B and C

type a

3bhk

1436sq.ft

type b

2 bhk

area: 1153sq.ft

type c

3bhk

area: 1478sq.ft

type D

3 bhk

area: 1147sq.ft

type e

2bhk

1129sq.ft

type f

3 bhk

area: 1311sq.ft

type G

3 bhk

area: 1364sq.ft

typical floor plan D, E, F and G

3 bhk

area: 1356sq.ft

STRUCTURE

RCC Framed structure with Column and Beam as per structural design. Outer wall constructed with 6" solid concrete blocks and inner wall 4" solid concrete blocks

ROOMS

2feet x 2feet Vitrified tiles

KITCHEN

2feet x 2feet Vitrified Tile. Glazed tiles above the counter top up to a height of 2feet. BATHROOMS Anti- skid ceramic tiles on the floor and Glazed tiles on the walls up to door lintel level

BALCONIES AND UTILITY

1 feet x 1 feet Terracotta design ceramic tiles

KITCHEN COUNTERS

18mm thick polished granite with round nosing

TOILETS

Imported / Indian (GUESS / Hindware / equivalent.) sanitary fittings. Concealed piping & premium quality CP fittings - Imported / Indian (Jaguar / Hindware / Equivalent). Hot & cold water taps with shower in all toilets

KITCHEN SINK

Single bowl stainless sink with drainboard of Imported / Nirali or equivalent make shall be provided in the kitchen

DOOR FRAMES

Teakwood Main door frame and Hardwood internal door frames.

DOOR SHUTTERS

Main door with teak veneer melamine polished, internal doors of moulded panel with enamel paint on both sides. FRP doors for toilets.

WINDOW SHUTTERS

UP VC sliding window shutters with 5mm thick glass panel.

ELECTRICITY

KSEB connection as per the rules & regulations of KSEB. Concealed conduit wiring with a copper conductor from Finolex / equivalent. Adequate light & Fan points with Legrand / Crabtree / equivalent switches. AC point in Master Bedroom. TV & Telephone points in living area. Provision for T.V & A.C points in all bedrooms. Provision for geyser & exhaust fan connections in all bathrooms.

PAINTING

Internal walls will be coated with Asian / ICI emulsion paints (roller finish). External walls will be coated with Asian / ICI weatherproof paints.

LIFT

Two Automatic Lifts of Johnson / Kone / equivalent make.

WATER SUPPLY

KWA water supply in kitchen subject to rules & regulations of KWA. Borewell & KWA water will be provided.

BACKUP GENERATOR

500 watts for 3BHK & 350 watts for 2BHK with automatic change over. Generator backup for common facilities like lift, common lights, pump rooms etc.

FIRE FIGHTING

As per Govt. Safety norms.

INTERCOM

Intercom facility for all Flats & Security cabin.

  • Swimming pool with Baby pool

  • Well-equipped Health Club with Gymnasium

  • Multi Purpose Entertainment & Party space

  • Children’s play area

  • Shuttle Court

  • Table Tennis and Card room

  • Billiards

  • Library

  • Sauna and Jacuzzi

  • Carom room

  • Barbeque counter

  • Provision for Centralized Gas Supply

  • Security Cabin and Round-the-clock security

  • Intercom facility

  • Car Washing Area

  • CCTV

  • Driver's room

  • Rainwater Harvesting System

  • Sewage Treatment Plant

  • Sky walk

Seaport Airport Road

Hill Palace

St. George Jacobite Church

Choice School

Railway Station

Thripunithura Private Bus Terminal

Govt.Ayurveda college

Sree Poornathrayeesa Temple

Nucleus Mall

150 mtr

500 mtr

500 mtr

1.0 Kms

1.0 Kms

1.5 Kms

3.0 Kms

3.0 Kms

4.0 Kms

Chottanikkara Temple

Crown Plaza Hotel

Vytilla Mobility Hub

Vytilla Jn.

Le Meridian Hotel

Info Park

5.0 Kms

6.0 Kms

6.0 Kms

6.0 Kms

6.2 Kms

8.0 Kms

2018 February

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

Work in progress as on 13/02/18

2017 September

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

Work in progress as on 08/09/17

2017 July

Work in progress as on 07/07/17

Work in progress as on 07/07/17

Work in progress as on 07/07/17

Work in progress as on 07/07/17

View from thripunithura Karingachira Main Road

2017 April

Working Status as on 20/04/2017

Work Status as on 20/04/2017

Working Status as on 20/04/2017

Working Status as on 20/04/2017

Working Status as on 20/04/2017

Work Status as on 20/04/2017

Site office under construction

Fencing work started

Fencing work completed

Earth work in Progress

2017 February

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017

Earth work in Progress

Piling work in progress as on 10/2/2017

Piling work in progress as on 10/2/2017